JobSiteCALCULATORS

Stone Calculator

Enter the area and depth of your stone layer. The calculator returns the volume in cubic yards and converts it to tons (crushed stone averages about 1.4 tons per cubic yard) so you can order by weight.

Updated · How we calculate

Your measurements

Common jobs:
ft
ft
in

Stone needed

6.22 tons

≈ 4.44 yd³

Create an estimate from these materials

Estimates only. Verify against your supplier's coverage figures before ordering.

Footprint

Footprint to scale

360 ft²4 in deep30 ft12 ft

Coverage

Surface area
360 ft²

How much stone for common jobs

JobSizeStone neededAlso
Walkway30 × 3 ft, 2 in deep0.78 tons≈ 0.56 yd³
Patio base16 × 12 ft, 4 in deep3.32 tons≈ 2.37 yd³
Drainage bed20 × 4 ft, 6 in deep2.07 tons≈ 1.48 yd³
Parking pad20 × 20 ft, 4 in deep6.91 tons≈ 4.94 yd³
Single-car driveway40 × 12 ft, 4 in deep8.3 tons≈ 5.93 yd³
Two-car driveway40 × 20 ft, 4 in deep13.83 tons≈ 9.88 yd³

Figures use this calculator's default settings; tap one above the inputs to load it and adjust.

The formula

Tons = (Length ft × Width ft × (Depth in ÷ 12) ÷ 27) × 1.4 tons/yd³

Example: A 30 ft × 12 ft patio base at 4 in deep = 4.44 yd³ ≈ 6.2 tons of stone.

How it works

  1. 1Calculate the volume in cubic yards (area × depth ÷ 27).
  2. 2Multiply by ~1.4 to convert cubic yards to tons for crushed stone.
  3. 3Suppliers usually sell by the ton, so order by weight.

Frequently asked questions

How much does a yard of stone weigh?

Crushed stone weighs roughly 1.3–1.5 tons (2,600–3,000 lb) per cubic yard depending on the stone size and how much fine material it contains. We use 1.4 tons per yard as a typical figure.